| Clerk of works |
| Posted By: Blue Print Blog on 7th of November 2013 |
The Clerk of Works often abbreviated CoW, is employed by the architect or the client on a construction site with the primary responsibility of representing the interests of the client on the project. In addition to recognizing the quality standards of the work the CoW is also charged with ensuring that the quality of both materials and workmanship are in accordance with the design information such as specifications and engineering drawings. The qualification for clerk of works can be held in three specializations: electrical, mechanical and construction. Historically the clerk of works was employed by the architect on behalf of a client or by local authorities to oversee public works. But in modern era the CoW can also be employed by the client (state body/local authority/private client) to monitor design and build projects where the traditional role of the architect is within the design and build project team. The role The role of this position is based on the impartiality of the clerk of works in ensuring that value for money for the client - rather than the contractor - is achieved through rigorous and detailed inspection of materials and workmanship throughout the building process. He should be independent in decisions and judgments. He cannot normally, by virtue of the quality role, be employed by the contractor –but only the client or normally by the architect on behalf of the client. His role is not to judge, but simply to report all occurrences that are relevant to the role. In many cases, the traditional title has been discarded to comply with modern trends, such as site inspector, architectural inspector and quality inspector, but the requirement for the role remains unchanged since the origins of the title. Clerks of works are either on site all the time or make regular visits. They need to be vigilant in their inspections of a large range of technical aspects of the work. The role involves;
|
Fundi Mjanja is a Kenyan company specializing in Building Material Supply, Building Construction Consultancy & Building Construction Personnel
Saturday, 30 November 2013
Clerk of works
Friday, 29 November 2013
Glass Blocks
| Glass Blocks |
| Posted By: Blue Print Blog on 31st of October 2013 |
Glass
block is an architectural element made from glass and they are used in a
building to add beauty while at the same time to provide visual
obscuration while admitting light. The glass block was originally
developed in the early 1900s to provide natural light in manufacturing
plants but over the years it has been considered as an element of
interior design commonly applied as part making the interior of the
house more appealing to the eye.
Glass bricks are produced for both wall and
floor applications. Glass blocks for use in floors are normally
manufactured as a single solid piece, or as a hollow glass block with
thicker side walls than the standard wall blocks. These blocks are
normally cast into a reinforced concrete grid-work or set into a metal
frame, allowing multiple units to be combined to span over openings in
basements and roofs. Glass wall blocks should not be used in flooring
applications. Hollow glass wall blocks are manufactured as two separate
hemispheres and, whilst the glass is still molten, the two hemispheres
are pressed together and annealed. The resulting glass blocks will have a
partial vacuum at the hollow centre.
Glass wall blocks in a house are erected after the floor and wall finishes are completed can be erected in short walls of three feet high to full height walls. They can be used to divide an entry porch and a sunken lounge or dinning. The blocks can also be used in a niche that provides light into a dark lobby as well as in the bathrooms as cubicles or for beauty since have they have good aesthetics. When installing glass blocks the area to be walled should be clean and free of any debris and dust and the abutting masonry should have the plaster complete as the blocks will be an in fill as they are not load bearing. The wall can be reinforced on the sides with aluminum frames to house doors or openings. The bonding should be carefully done in accordance to the manufacturer’s instructions. The most commonly used bonding agent with glass wall blocks is Silicon. Care should be taken to ensure that every part of the joint is filled with the adhesive.
When all the courses are complete to the
desired height the top of the wall can be finished with timber, aluminum
or rubber rails. The top finishing is used as a protection for the
glass block and can also be used for holding small flower pots,
portraits, paintings or any other interior beauty enhancing objects.
|
Thursday, 28 November 2013
Building a Safe Staircase
| Building a Safe Staircase |
| Posted By: Blue Print Blog on 24th of October 2013 |
The
staircase in a building is one means whereby one may travel from the
level of one floor to another. The ease with which a stairway can be
traveled depends upon the proper proportioning of the riser and tread of
each step and the number of steps in one series or flight. The design
of the building and the space allowed for stairs will control the type
of staircase which may be built.
The staircase, when carefully designed and built, adds dignity and charm to a home. The quality of craftsmanship displayed reflects the character of the entire interior of the building. In general, stair-work is considered a special field of carpentry. Stairways can be the cause of the greatest number of accidents in the home. These accidents can be attributed to various factors; some, of course, are beyond the control of those who design and build the stairways. However, there are far too many accidents due directly to faulty construction. The carpenter can make a worthwhile contribution toward accident prevention if he plans and does his work well. The following standards and suggestions should be observed when building the staircase to help avoid some of the causes responsible for the accidents;
|
Wednesday, 27 November 2013
The Collapse of Buildings
| The Collapse of Buildings |
| Posted By: Blue Print Blog on 17th of October 2013 |
Buildings, like all structures are designed
with special attention to allow the support certain loads without
deforming. The loads that are taken into account during the design stage
of any building include both live loads and dead loads like furniture
and equipment. For a building to be declared safe for occupation it must
be able to withstand the weight of rain and the pressure of wind as
well as bear the load of the building itself.
Buildings that comprise fewer floors, strength generally accompanies sufficient rigidity and the design is mainly that of a roof that will keep the weather out while spanning large open spaces. With tall buildings that consists of several floors the roof becomes a minor matter and the support of the weight of the building itself should be the main consideration since just like long bridges, tall buildings are subject to catastrophic collapse if considerable care is not taken during the design stage.
The main causes of collapse in buildings can be generally classified under the following;
Bad Design Bad design due to errors of computation and failure to take into account the loads the structure will be called upon to carry, erroneous theories, reliance on inaccurate data, ignorance of the effects of repeated or impulsive stresses, and improper choice of materials or misunderstanding of their properties may easily result into a collapse of the building. The engineer should take a keen interest during the design stage as he is bound to be held responsible in the event of these failures. Faulty construction Faulty construction has been the most often cause in recurrence of structural failure. This may occur due to mistakes arising from lax in inspection which includes the use of salty sand during concrete mixing, the substitution of inferior steel for that specified, bad riveting or even improper tightening of nuts, bad welds, and other practices well known to the construction worker. Foundation Failure Even an excellently designed and constructed structure will not stand on a bad foundation. Although the structure will carry its loads, the earth beneath it may not. The Leaning Tower of Pisa is a famous example of bad foundations but it is not the only one. The old armory in St. Paul, Minnesota, sank 20 feet or more into soft clay, but did not collapse. The displacements due to bad foundations may alter the stress distribution upon the building significantly. Extraordinary Loads Extraordinary loads are often natural, such as repeated heavy snowfalls, or the shaking of an earthquake, or the winds of a hurricane. A building that is intended to stand for some years should be able to meet the challenges of extraordinary load that may arise from frequent earthquakes and strong winds. Even a solid masonry building would be destroyed in an event of earthquakes if the foundation is not designed carefully to withstand external natural strains. |
Tuesday, 26 November 2013
Building Demolitions
| Building Demolitions |
| Posted By: Blue Print Blog on 3rd of October 2013 |
Demolition projects can range from small,
simple jobs to complicated undertakings that require sophisticated and
detailed planning. Site conditions can vary significantly, and there is
always a degree of imprecision to the wrecking of the building itself.
For typical building demolition and site improvements the most common
procedure is to use heavy mechanical equipment such as wrecking balls,
excavation hoes, grapples, crushers, and hydraulic breakers and shears.
Several factors need to be considered prior to and during demolition,
including the scheduling of demolition activities, protecting the site
(especially important with occupied structures), and dealing with
hazardous materials.
With the demolition of structures, the owner, architect, engineer and demolition contractor need to be aware of the regulations that govern the demolition of buildings. Prior to allowing the demolition squad to start demolition operations, an engineering survey of the building that is marked up for demolition should be carried out by a competent and qualified person to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the building. The demolition team should have in writing evidence that such a survey has been undertaken and the demolition process has been given a go ahead from the relevant authorities. Building demolition can include items that may not be apparent at first such as any below-grade structures that would include various types of footings and foundations. Also underground utilities that provided services to the building and the adjacent buildings will need to be considered during demolition. In rural areas--where buildings are not densely packed--and the built structures themselves are often smaller with fewer recyclable materials, demolition is usually uncomplicated, in that the structure can be knocked down and the debris can be removed all together but in urban and densely packed areas, demolition projects may require the hiring of an architect or engineer to produce documents, drawings, and specifications for building demolition. Contractors who specialize in demolition need to come up with a demolition schedule to manage the project. If the owner will be occupying a portion of the site or building during demolition, a schedule of demolition activities will be useful to avoid interference with any concurrent operations and to minimize any disruption of utilities and services. The owner may have additional restrictions that the contractor will need to consider when scheduling activities. Some typical owner restrictions include the protection of exterior stairs, loading docks, and entries of adjacent buildings, as well as a limitation on hours during which demolition operations may take place. However, every additional restriction the contractor needs to manage will usually be reflected in higher demolition costs. In areas with greater population density, the demolition of structures is not necessarily more complicated.
Some situations are complex and mandate a
high level of sensitivity to how demolition is handled, for example,
demolition that takes place on a hospital campus. In these instances, a
careful, piece-by-piece dismantling of the building is usually
necessary, with material sorting often taking place on site. For such
projects, an engineer or architect will need to be consulted to produce
specifications to which the demolition must conform. The architect or
engineer will produce the necessary documents which clearly outline the
requirements for protecting individuals, adjacent buildings, and any
remaining site improvements and utilities during the demolition
operations.
|
Monday, 25 November 2013
Quality Construction of Suspended Floors
| Quality Construction of Suspended Floors |
| Posted By: Nyumba Imara Blog on 7th of November 2013 |
Building suspended floors that are
acceptably flat and level is one of the many challenges that contractors
may have to face in the course of a project construction. Whether
supported by steel beams or a cast-in-place concrete frame every
elevated floor deflects or sags slightly under its own weight.
Structural drawings generally require that individual floor framing
members have a slight camber, or hump in their profile prior to
construction so as when cambered floor framing members are allowed to
deflect they ideally will move to a level position. When everything
works right, the floor’s finished surface will then perfectly complement
structural deflection.
Forms and shoring should be designed to allow safe, easy removal, while protecting the structure from excessive deflections at early stages. However buildings come in many shapes and sizes and as the available materials and floor framing are assembled together unique combinations are created thus the resulting floor systems do not always deflect to the engineer’s expectations. That's why the successful contractor must remain flexible and be ready to respond to jobsite developments. Success depends on two things—an effective preconstruction planning program and the ability to identify and adjust to unexpected conditions. Monitoring the Construction The goal in constructing any project is to meet and if possible exceed the requirements of the specifications. When evaluating construction of floors, the following standards, depending on the structural system should apply;
The following are essential elements to be put in place so as to achieve a quality suspended floor;
Controlling quality Controlling the elevation of the supporting platform requires that engineering controls be established. The monitoring program for a structural steel frame provides key information about critical components such as base plate, column splice, and beam-to-column connection elevations, along with deflection of typical framing members. On a cast-in-place concrete frame, the contractor should select forming and shoring systems. Forms and shoring should be designed to allow safe, easy removal, while protecting the structure from excessive deflection at early stages. Evaluating concrete mix designs, delivery systems, and finishing techniques provides an opportunity to achieve the quality standards. Each decision will impact the flatness and levelness of the finished floor. Concrete mixes must develop adequate strength while providing good consolidation, consistent set time, and workability. The workers involved on the project must be capable of producing work that conforms to the quality standards. Concrete finishing techniques must produce the desired results. The pre-construction meeting is a good opportunity to address the team's plan for coping with isolated locations where actual deflection of the floor might be different from what is expected. Discussing job site controls for structural steel, form-work, reinforcing steel, concrete, and finished surface profiles will help ensure that backup systems are ready. Changes and substitutions in materials or admixtures should not be made without notifying and obtaining approval by the rest of the design/construction team. |
Saturday, 23 November 2013
Common Plaster Problems
| Common Plaster Problems |
| Posted By: Nyumba Imara Blog on 31st of October 2013 |
When
plaster dries, it is a relatively rigid material which should last
almost indefinitely. However at times the plaster work may start
cracking due to several conditions. Some of the conditions that may
cause the plaster to crack, efflorescence (that is to lose moisture and
turn to a fine powder on exposure to air), separate, or become detached
from its lath framework include;
• Structural problems • Poor workmanship • Improper curing • Moisture Structural Problems
1. Overloading
Stresses within a wall, or acting on the house as a whole may end up creating stress cracks. Appearing as diagonal lines in a wall, stress cracks usually start at a door or window frame, but they can appear anywhere in the wall, with seemingly random starting points. The weight of the roof, the second and third stories, the furniture, and the occupants may impose a heavy burden on beams, joists, and studs. Even when houses are built properly, later remodeling efforts may cut in a doorway or window without adding a structural beam or "header" across the top of the opening. Occasionally, load-bearing members are simply too small to carry the loads above them and may lead to deflection or wood "creep" (deflection that occurs over time) thus creating cracks in plaster. Overloading and structural movement combined with rotting floorboard, rusted nails, or poor quality plaster results in the plaster detaching from the lath (floorboard) therefore losing its key. When the mechanical bond with the lath is broken, plaster becomes loose or bowed and if repairs are not made, especially to ceilings, gravity will simply cause chunks of plaster to fall to the floor. 2. Settlement/Vibration Cracks in walls can also result when there is settlement in a house. Houses built on clay or black cotton soils are especially vulnerable to cracks when settlement occurs as clay soils are highly expansive. In the dry season, water evaporates from the clay particles, causing them to contract. During the rainy season, the clay swells thus causing a building that is not structurally sound to be riding on an unstable footing. Diagonal cracks running in opposite directions suggest that house settling and soil conditions may be at fault. Similar symptoms occur when there is a nearby source of vibration-blasting or busy highway. 3. Lath Movement Horizontal cracks are often caused by lath movement. Because it absorbs moisture from the air, wood lath expands and contracts as humidity rises and falls. This can cause cracks to appear year after year. Cracks can also appear between rock lath panels. A nail holding the edge of a piece of lath may rust or loosen, or structural movement in the wood framing behind the lath may cause a seam to open. Heavy loads in a storage area above a rock-lath ceiling can also cause ceiling cracks. Errors in initial building construction such as improper bracing, poor corner construction, faulty framing of doors and windows, and undersized beams and floor joists eventually manifest through to the plaster surface. |